Wellcome to National Portal
মেনু নির্বাচন করুন
Main Comtent Skiped

five year plan

o. 3 Hosnabad Union Parishad Office.

Betagi, Barguna.

Subject: 2021-22/ 2022-23/ 2023-24/ 2024-25/ 2025-26) The priority lists of Five Year Plan projects for the financial year are given below:


1. Anor Jalisa from Abdul Khan's house became Anor Jalisa Mosque and the pool of Dafadar's house was covered with Rastma bricks. Bricklaying 

2. Anor Jalisa Akon Bari from Matubabar Bari Pool Parimatma Rastma brick saling. Bricklaying 

3. Construction of canal paved ghatla in front of Kadamtala Community School and saling with Rastma bricks from the school. Paved Ghatla/Brick Soling Karon 

4. In front of the Maharaj's shop of Hosnabad Sakin, from the base of the pool on the north side of the canal to the house of Sanu Khan, North-West Reg. Pvt. Bricklaying

5. From Malakar's house on the south side of Katakhali Sulej Gate, A. Chalam, in front of the house of ex-UP member Saheb, the school parimamatm Rastma was made by bricks. Itsling Karon

6. From North Hosnabad Pedestrian House to North Hosnabad S. Pra. B. Parimatma Rastma by bricks Itsling Karon

7. Dr. Basanda Ah Majid Rhari's house in front of the brick saling Rastma from the head of Ramnasttam Fakir's house Parimamatma Rastma brick saling. Bricklaying

8. From D. Basanda Wapda, the house of Vijay Sheel became the house of Ah Rashid Bepari. Bricklaying

9. Ano Jalisa Sulij gate east bank Wapda nearest Master Bari Via Meera Bari Paramatma Rastma brick saling. Paka Ghatla

10. Supply of multi media projector and one UPS to Hosnabad Union Parishad. Multi Media Projector

11 Dr. Hosnabad Chowkidar's canal pool in front of Tota member's house in front of the canal. Pool repair

12. Repair of pool with slipper on canal in front of Serjan Ali Sardar house school. Pool repair

13. D. Hosnabad A. Azizul Haq Talukdar's Raich Mill became Sagir Talukdar's house and the pool of Anmatma Sheel's house was walled with rastma bricks. Bricklaying

14. Construction of canal-paved ghatla in front of Kismat Karamnana Government Primary School No. 28. Paka Ghatla

15. In front of Dr. Hosnabad wash house, the mosque of Gani Khan's house was covered with Rastma bricks. Bricklaying

16. From the Hat Bazar of U. Karamnana Khan along the Betagi-Barguna highway, reach Mokamiya border by road. Bricklaying

17. On the Betagi-Barguna highway U. Karamnana Reg. Pvt. B. From the Rastma on the south side, the Bepari Bari Parimatma Rastma is made with bricks. Bricklaying

18. Panchayat house from North Karmanna Khalil Faraji house is walled with Rastma bricks. Bricklaying

19. Meher Gazi Karamnana Madhya Karamnana Mr. Prof. B. from the brick saling in front of Kazir Hat Rastma, advocate Gazi Samsul Haque Sahib's house Parimatma Rastma Karan brick saling. Bricklaying.

20. Edhya Karmanna Govt. Pvt. Paka Ghatla

21. From Meher Gazi Karamnana highway, the house of Babul Mia became a gharami house, and he built it with Rastma bricks. Bricklaying.

22.  From the base of Napit Khali Canal to Masud Mia's mill house, Chhopkhalidhan Manik Chatra Reg. Prof. B. Parimatma Rastma made saling with bricks. Brick Soling

23. Repair of pool with cistern of two pools also on western side adjacent to Masud Mill Bari of Chhopkhali Sakin. Pool repair

24. Construction of iron pool on the canal next to Enchab Ali Chowkidar's house in Chhopkhali Sakin. Pool repair

25. Manowar Hossain Akon's house was made from Chhopkhali Paka Rastma with Parimatma Rastma bricks. Bricklaying

26. From East Chhopkhali Wapda, Humayun Kabir's Jomaddar's house, on the east side of Mrdha Bari, Char Chhopkhali Govt. Pvt. Bricklaying

27. The Rastma in front of the house of Chhopkhali Fazle Karim is covered with bricks. Bricklaying


Subject: The priority lists of Five Year Plan projects for the financial year 2022-2023 are given below.

1. Ano completed the unfinished work of the pool on the canal in front of Jalisa Ramnastam's house. Pool repair

2. Construction/Construction of Iron Pool Dhali Bari on Ano Jalisa Das Canal. Pool repair

3. Construction of paved latrines in Hosnabad Phultala Bazar and paving with Rastma bricks from the paved ghatla of Hawladar Bari. Paka Ghatla / Brick Soling Karon

4. From Hosnabad Nazrmanal master house pool to Phultala Reg. Pvt. Itsling Karon

5. North Hosnabad S. P. B. Construction of paved ghatla in front of canal and school grounds filled with soil. Paka Ghatla/Earth work

6. Construction of paved drain with canal for draining water to the field on west side of Hosnabad bar house. Construction of paved drains

7. Construction of Paved Ghatla in front of Hosnabad Bottala Reg. Paka Ghatla

8. Construction of iron pool in the canal in front of Hosnabad Alam Kazi's house. Pool construction

9. From Basanda Wapda to Zainal Hang Bari till Hasem Hang Bari